The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to India in ₹. Local stan
The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to India in ₹. Local stan
Contact us for more information about Ceramic | India
Contact us for India
Contact Us
ZTW Environmental Protection Technology Co., Ltd. focuses on the field of industrial flue gas treatment, and is committed to providing integrated solutions for denitrification, desulfurization, defluorination, dust removal and ammonia removal with ceramic catalytic filter tubes and ceramic fiber filter tubes as core technologies. Relying on the concept of ceramic integrated design, the company integrates catalysis, filtration and dust removal functions into high-performance ceramic tubes. Its denitrification efficiency is more than 95%, and its dust removal efficiency exceeds 99.99%, which is suitable for high-pollution industries such as glass kilns, steel, and coking.
ZTW Tech supplies ceramic catalytic filter elements and ceramic fiber filter elements to India industrial operators. Local project pricing is quoted in ₹ (INR), and every quotation includes technical drawings and a technical data sheet in metric units.
Key industries served in India
cement and clinker kilns
steel and blast furnaces
glass manufacturing
power plants
chemical and petrochemical plants
Standards and compliance for India
BIS standards
CPCB emission norms
MoEFCC regulations
IS 1461 series for filter media
Applications by industry
Cement and clinker kilns
Rotary kilns with a burning zone at 1450°C and a calciner at around 1050°C. The NOx reduction duty sits after the tertiary duct, where the catalytic element still has enough temperature to hold conversion.
Steel and blast furnaces
Sinter plant and blast furnace gas at 250-450°C with high particulate loading. Ceramic elements replace baghouses in the hot sections and cut the frequency of bag changes in Indian dust conditions.
Glass manufacturing
Float and container glass kilns at 1400-1600°C with ammonia dosing on newer lines. The retrofit covers the kiln hood and the flue gas path, where the flue gas temperature is still above 400°C.
Regulatory compliance in India
Indian industrial emissions are governed by CPCB emission norms and the consent conditions issued by the State Pollution Control Board under the Water and Air Acts. Filter media is commonly specified to BIS standards and the IS 1461 series, with MoEFCC regulations covering the consent regime, and third-party accredited stack testing is normally part of the compliance file.
Supply, lead time and logistics
Quotations are issued in INR with 30-day validity. Elements are manufactured in China and shipped by sea to Nhava Sheva, Mundra or Chennai, typically 18-26 days, or by air in 6-8 days. Stocked diameters are dispatched within 3 days with installation drawings and a commissioning checklist.
India
Technical support is provided in English with ₹ quotation and local lead-time guidance. Request a free filter sample or discuss an OEM / ODM programme.
Search coverage for India
Content for India is indexed in Google India, Bing India.
India
Indian
Gujarat
Maharashtra
Tamil Nadu
Uttar Pradesh
Frequently asked questions
Do the elements meet CPCB and BIS requirements?
Yes. We supply material data referencing BIS standards and the IS 1461 series, together with permeability, burst strength and temperature resistance test reports, and we support the consent documentation for the retrofit.
What are the lead times and payment terms to India?
18-26 days by sea to Nhava Sheva, Mundra or Chennai and 6-8 days by air, with stocked diameters shipped within 3 days. Quotations are issued in INR with 30-day validity and the Incoterm is stated on every offer.
Can you support an Indian EPC or OEM partner?
Yes. We provide the design basis, performance guarantees, drawings and commissioning checklists, and we support OEM partners on the performance test protocol so the guaranteed figures match site measurements.
ZTW
We will reach you within 1 hour.
2026-11-26 09:05:59
Hello, welcome to ZTW. Please reach out to us at any time.
We have received your ticket and will get back to you within 24 hours.